About these crash totals
Counts come from NYC police crash reports (NYC Open Data). We sum all crashes, injuries, and deaths for this area across the selected time window shown on the card. Injury severity follows the official definitions in the NYPD dataset.
- Crashes: number of police‑reported collisions (all road users).
- All injuries: total injured people in those crashes.
- Moderate / Serious: subcategories reported by officers (e.g., broken bones vs. life‑threatening trauma).
- Deaths: people who died due to a crash.
Notes: Police reports can be corrected after initial publication. Minor incidents without a police report are not included.
Close▸ Killed 6,919
▸ Crush Injuries 666
▸ Amputation 50
▸ Severe Bleeding 767
▸ Severe Lacerations 697
▸ Concussion 1,152
▸ Whiplash 6,248
▸ Contusion/Bruise 9,532
▸ Abrasion 6,406
▸ Pain/Nausea 2,724
About this chart
We group pedestrian injuries and deaths by the vehicle type that struck them (as recorded in police reports). Use the dropdown to view totals, serious injuries, or deaths.
- Trucks/Buses, SUVs/Cars, Mopeds, and Bikes reflect the reporting categories in the crash dataset.
- Counts include people on foot only; crashes with no injured pedestrians are not shown here.
Notes: Police classification can change during investigations. Small categories may have year-to-year variance.
CloseAstoria Park
Help Fix the Problem.
This address sits in
Traffic Safety Timeline for Astoria Park
29Int 1431-2025
A Local Law to amend the administrative code of the city of New York, in relation to requirements for police department high-speed vehicle pursuits: Council vote▸
-
File Int 1431-2025,
NYC Council – Legistar,
Published 2025-10-29
29Int 1431-2025
A Local Law to amend the administrative code of the city of New York, in relation to requirements for police department high-speed vehicle pursuits: Council vote▸
-
File Int 1431-2025,
NYC Council – Legistar,
Published 2025-10-29
29Int 1431-2025
Tiffany Cabán▸
-
File Int 1431-2025,
NYC Council – Legistar,
Published 2025-10-29
29Int 1431-2025
Tiffany Cabán▸
-
File Int 1431-2025,
NYC Council – Legistar,
Published 2025-10-29
22
Driver in deadly Nassau Expressway hit-and-run was speeding to Dunkin', prosecutors say▸
-
Driver in deadly Nassau Expressway hit-and-run was speeding to Dunkin', prosecutors say,
Gothamist,
Published 2025-09-22
21
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.▸
-
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.,
NY Daily News,
Published 2025-09-21
20
Female construction worker killed on Queens job site, hit-and-run driver arrested▸
-
Female construction worker killed on Queens job site, hit-and-run driver arrested,
NY Daily News,
Published 2025-09-20
18
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers▸
-
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers,
NY Daily News,
Published 2025-09-18
15
2 children struck by driver in Queens, suspect in custody, witnesses say▸
-
2 children struck by driver in Queens, suspect in custody, witnesses say,
CBS New York,
Published 2025-09-15
13
16-year-old girl struck and killed in Queens▸
-
16-year-old girl struck and killed in Queens,
CBS New York,
Published 2025-09-13
10Int 1375-2025
Cabán leads primary sponsorship of bicycle parking expansion, improving safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- File Int 1431-2025, NYC Council – Legistar, Published 2025-10-29
29Int 1431-2025
A Local Law to amend the administrative code of the city of New York, in relation to requirements for police department high-speed vehicle pursuits: Council vote▸
-
File Int 1431-2025,
NYC Council – Legistar,
Published 2025-10-29
29Int 1431-2025
Tiffany Cabán▸
-
File Int 1431-2025,
NYC Council – Legistar,
Published 2025-10-29
29Int 1431-2025
Tiffany Cabán▸
-
File Int 1431-2025,
NYC Council – Legistar,
Published 2025-10-29
22
Driver in deadly Nassau Expressway hit-and-run was speeding to Dunkin', prosecutors say▸
-
Driver in deadly Nassau Expressway hit-and-run was speeding to Dunkin', prosecutors say,
Gothamist,
Published 2025-09-22
21
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.▸
-
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.,
NY Daily News,
Published 2025-09-21
20
Female construction worker killed on Queens job site, hit-and-run driver arrested▸
-
Female construction worker killed on Queens job site, hit-and-run driver arrested,
NY Daily News,
Published 2025-09-20
18
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers▸
-
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers,
NY Daily News,
Published 2025-09-18
15
2 children struck by driver in Queens, suspect in custody, witnesses say▸
-
2 children struck by driver in Queens, suspect in custody, witnesses say,
CBS New York,
Published 2025-09-15
13
16-year-old girl struck and killed in Queens▸
-
16-year-old girl struck and killed in Queens,
CBS New York,
Published 2025-09-13
10Int 1375-2025
Cabán leads primary sponsorship of bicycle parking expansion, improving safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- File Int 1431-2025, NYC Council – Legistar, Published 2025-10-29
29Int 1431-2025
Tiffany Cabán▸
-
File Int 1431-2025,
NYC Council – Legistar,
Published 2025-10-29
29Int 1431-2025
Tiffany Cabán▸
-
File Int 1431-2025,
NYC Council – Legistar,
Published 2025-10-29
22
Driver in deadly Nassau Expressway hit-and-run was speeding to Dunkin', prosecutors say▸
-
Driver in deadly Nassau Expressway hit-and-run was speeding to Dunkin', prosecutors say,
Gothamist,
Published 2025-09-22
21
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.▸
-
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.,
NY Daily News,
Published 2025-09-21
20
Female construction worker killed on Queens job site, hit-and-run driver arrested▸
-
Female construction worker killed on Queens job site, hit-and-run driver arrested,
NY Daily News,
Published 2025-09-20
18
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers▸
-
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers,
NY Daily News,
Published 2025-09-18
15
2 children struck by driver in Queens, suspect in custody, witnesses say▸
-
2 children struck by driver in Queens, suspect in custody, witnesses say,
CBS New York,
Published 2025-09-15
13
16-year-old girl struck and killed in Queens▸
-
16-year-old girl struck and killed in Queens,
CBS New York,
Published 2025-09-13
10Int 1375-2025
Cabán leads primary sponsorship of bicycle parking expansion, improving safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- File Int 1431-2025, NYC Council – Legistar, Published 2025-10-29
29Int 1431-2025
Tiffany Cabán▸
-
File Int 1431-2025,
NYC Council – Legistar,
Published 2025-10-29
22
Driver in deadly Nassau Expressway hit-and-run was speeding to Dunkin', prosecutors say▸
-
Driver in deadly Nassau Expressway hit-and-run was speeding to Dunkin', prosecutors say,
Gothamist,
Published 2025-09-22
21
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.▸
-
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.,
NY Daily News,
Published 2025-09-21
20
Female construction worker killed on Queens job site, hit-and-run driver arrested▸
-
Female construction worker killed on Queens job site, hit-and-run driver arrested,
NY Daily News,
Published 2025-09-20
18
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers▸
-
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers,
NY Daily News,
Published 2025-09-18
15
2 children struck by driver in Queens, suspect in custody, witnesses say▸
-
2 children struck by driver in Queens, suspect in custody, witnesses say,
CBS New York,
Published 2025-09-15
13
16-year-old girl struck and killed in Queens▸
-
16-year-old girl struck and killed in Queens,
CBS New York,
Published 2025-09-13
10Int 1375-2025
Cabán leads primary sponsorship of bicycle parking expansion, improving safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- File Int 1431-2025, NYC Council – Legistar, Published 2025-10-29
22
Driver in deadly Nassau Expressway hit-and-run was speeding to Dunkin', prosecutors say▸
-
Driver in deadly Nassau Expressway hit-and-run was speeding to Dunkin', prosecutors say,
Gothamist,
Published 2025-09-22
21
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.▸
-
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.,
NY Daily News,
Published 2025-09-21
20
Female construction worker killed on Queens job site, hit-and-run driver arrested▸
-
Female construction worker killed on Queens job site, hit-and-run driver arrested,
NY Daily News,
Published 2025-09-20
18
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers▸
-
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers,
NY Daily News,
Published 2025-09-18
15
2 children struck by driver in Queens, suspect in custody, witnesses say▸
-
2 children struck by driver in Queens, suspect in custody, witnesses say,
CBS New York,
Published 2025-09-15
13
16-year-old girl struck and killed in Queens▸
-
16-year-old girl struck and killed in Queens,
CBS New York,
Published 2025-09-13
10Int 1375-2025
Cabán leads primary sponsorship of bicycle parking expansion, improving safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- Driver in deadly Nassau Expressway hit-and-run was speeding to Dunkin', prosecutors say, Gothamist, Published 2025-09-22
21
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.▸
-
Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A.,
NY Daily News,
Published 2025-09-21
20
Female construction worker killed on Queens job site, hit-and-run driver arrested▸
-
Female construction worker killed on Queens job site, hit-and-run driver arrested,
NY Daily News,
Published 2025-09-20
18
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers▸
-
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers,
NY Daily News,
Published 2025-09-18
15
2 children struck by driver in Queens, suspect in custody, witnesses say▸
-
2 children struck by driver in Queens, suspect in custody, witnesses say,
CBS New York,
Published 2025-09-15
13
16-year-old girl struck and killed in Queens▸
-
16-year-old girl struck and killed in Queens,
CBS New York,
Published 2025-09-13
10Int 1375-2025
Cabán leads primary sponsorship of bicycle parking expansion, improving safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- Hit-run driver speeding to Dunkin’ Donuts when he killed Queens expressway construction worker: D.A., NY Daily News, Published 2025-09-21
20
Female construction worker killed on Queens job site, hit-and-run driver arrested▸
-
Female construction worker killed on Queens job site, hit-and-run driver arrested,
NY Daily News,
Published 2025-09-20
18
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers▸
-
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers,
NY Daily News,
Published 2025-09-18
15
2 children struck by driver in Queens, suspect in custody, witnesses say▸
-
2 children struck by driver in Queens, suspect in custody, witnesses say,
CBS New York,
Published 2025-09-15
13
16-year-old girl struck and killed in Queens▸
-
16-year-old girl struck and killed in Queens,
CBS New York,
Published 2025-09-13
10Int 1375-2025
Cabán leads primary sponsorship of bicycle parking expansion, improving safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- Female construction worker killed on Queens job site, hit-and-run driver arrested, NY Daily News, Published 2025-09-20
18
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers▸
-
Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers,
NY Daily News,
Published 2025-09-18
15
2 children struck by driver in Queens, suspect in custody, witnesses say▸
-
2 children struck by driver in Queens, suspect in custody, witnesses say,
CBS New York,
Published 2025-09-15
13
16-year-old girl struck and killed in Queens▸
-
16-year-old girl struck and killed in Queens,
CBS New York,
Published 2025-09-13
10Int 1375-2025
Cabán leads primary sponsorship of bicycle parking expansion, improving safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- Nude Queens man indicted for kicking bike riders, attacking 3 NYPD officers, NY Daily News, Published 2025-09-18
15
2 children struck by driver in Queens, suspect in custody, witnesses say▸
-
2 children struck by driver in Queens, suspect in custody, witnesses say,
CBS New York,
Published 2025-09-15
13
16-year-old girl struck and killed in Queens▸
-
16-year-old girl struck and killed in Queens,
CBS New York,
Published 2025-09-13
10Int 1375-2025
Cabán leads primary sponsorship of bicycle parking expansion, improving safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- 2 children struck by driver in Queens, suspect in custody, witnesses say, CBS New York, Published 2025-09-15
13
16-year-old girl struck and killed in Queens▸
-
16-year-old girl struck and killed in Queens,
CBS New York,
Published 2025-09-13
10Int 1375-2025
Cabán leads primary sponsorship of bicycle parking expansion, improving safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- 16-year-old girl struck and killed in Queens, CBS New York, Published 2025-09-13
10Int 1375-2025
Cabán leads primary sponsorship of bicycle parking expansion, improving safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
Sep 10 - Int. 1375 orders DOT to install 5,000 bicycle parking stations over five years, with at least 400 per year on commercial blocks. The measure aims to make cycling more secure, cut sidewalk bike clutter, and boost safety in underserved neighborhoods.
Bill Int. 1375 (Int 1375-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: LS #14435 filed 02/26/2025; event recorded 2025-09-10; effective date: immediately. Matter title: "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program." The bill requires DOT to install 5,000 bicycle parking stations over five years (1,000 per year), with at least 400 annually on commercial blocks, post locations online, and file a one-time report within six years. Prime sponsors Gale A. Brewer, Tiffany Cabán (primary), Lincoln Restler and Shahana K. Hanif introduced the bill. Safety note: expanding 5,000 stations—especially on commercial blocks and in underserved areas—will make cycling more convenient and secure, encourage mode shift and safety in numbers, and cut bike clutter and pedestrian conflicts.
- File Int 1375-2025, NYC Council – Legistar, Published 2025-09-10
10Int 1375-2025
Cabán prime sponsors bike parking station expansion, boosting overall street safety▸Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
-
File Int 1375-2025,
NYC Council – Legistar,
Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
Sep 10 - Int. 1375 orders DOT to install 5,000 bike parking stations over five years. 1,000 a year. 400 on commercial blocks. It cuts sidewalk clutter, houses bikes off the curb, and strengthens safety for riders and pedestrians.
Int. No. 1375 is at SPONSORSHIP. Introduced 02/26/2025; event date 2025-09-10. Committee: Committee on Transportation and Infrastructure. The measure, titled "A Local Law to amend the administrative code of the city of New York, in relation to expanding the bicycle parking station program," would require DOT to install at least 5,000 bicycle parking stations over five years (1,000 per year; at least 400 on commercial blocks), post locations online, and deliver a one-time report within six years. Tiffany Cabán is the primary sponsor; Lincoln Restler and Gale A. Brewer are co-sponsors. Safety analysts note that expanding secure, well-sited bike parking—especially on commercial blocks and in underserved areas—supports mode shift, reduces sidewalk clutter from ad hoc parking, and improves end-of-trip safety; impact will be strongest if DOT prioritizes curb/roadway placement over sidewalks to protect pedestrian space.
- File Int 1375-2025, NYC Council – Legistar, Published 2025-09-10
8
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash▸
-
Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash,
NY Daily News,
Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- Brooklyn dad recently retired from NYPD dies with girlfriend in motorcycle crash, NY Daily News, Published 2025-09-08
2
Queens bus network redesign draws mixed reviews from riders▸
-
Queens bus network redesign draws mixed reviews from riders,
CBS New York,
Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
- Queens bus network redesign draws mixed reviews from riders, CBS New York, Published 2025-09-02
1
Unsafe speed on Triborough Bridge; two ejected▸Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
Sep 1 - Northbound on the Triborough, three drivers crashed. The crash flipped an SUV. A moped was destroyed. Two people were ejected. A woman bled from the head. Four others hurt. Police recorded Unsafe Speed by drivers.
A moped, a Tesla SUV, and a Mercedes sedan crashed while heading north on the Triborough Bridge just after midnight. Six people were injured. Two were ejected: a 27-year-old driver with severe bleeding, and a woman passenger, semiconscious with a head wound. The SUV ended up overturned. The moped was demolished. Four others reported pain: the SUV driver, the sedan driver, and two front-seat passengers. "According to the police report, police recorded Unsafe Speed by drivers." Pre-crash data lists two drivers going straight and the sedan changing lanes.
19
Tiffany Cabán Backs Safety‑Boosting 31st Street Protected Bike Lanes▸Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
-
Elected officials outline continued support for 31st Street protected bike lanes in Astoria,
AMNY,
Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
Aug 19 - Local officials backed DOT's protected bike lanes under the elevated 31st Street tracks. A New York State Supreme Court issued a temporary injunction that paused the plan. Leaders urged the city to move the separated lanes forward to protect cyclists and pedestrians.
Bill/file number: none. Status: press release; plan supported by local officials but temporarily blocked by a New York State Supreme Court temporary injunction. Committee: N/A. Key date: 2025-08-19 (press statement). The matter titled "Elected officials outline continued support for 31st Street protected bike lanes in Astoria" urges DOT to install protected lanes beneath the elevated tracks. Council Member Tiffany Cabán and Assembly Member Jessica González-Rojas publicly backed the project. A state senator also expressed support (name withheld). Safety analysts note protected bike lanes under elevated tracks expand safe cycling infrastructure, reduce motor-vehicle-bicycle conflicts, and support mode shift to active travel; benefits depend on continuous, well-lit, accessible design to protect equity and nighttime safety.
- Elected officials outline continued support for 31st Street protected bike lanes in Astoria, AMNY, Published 2025-08-19
14Int 1353-2025
Cabán co-sponsors bill setting deadlines for school-adjacent traffic devices.▸Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
Aug 14 - Int. 1353 forces DOT to install approved traffic calming or control devices on streets adjacent to schools within 60 days of a traffic study. Exempts major projects. Cuts delays that keep walkers and cyclists exposed to danger.
Bill: Int. 1353 (Int 1353-2025). Status: SPONSORSHIP. Committee: Committee on Transportation and Infrastructure. Key dates: filed 07/14/2025; published 08/14/2025. The matter "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school" requires DOT to complete installation within 60 days of a traffic study determination, except for major projects. Primary sponsor: Farah N. Louis. Co-sponsors: Jennifer Gutiérrez, Justin L. Brannan, Lincoln Restler, Tiffany Cabán. Safety analysts say the 60-day deadline shrinks harmful delays, likely improving safety for pedestrians and cyclists, aiding crossings, encouraging walking and biking to school, and advancing equity — but benefits depend on enforcement and funding.
- File Int 1353-2025, NYC Council – Legistar, Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors bill shortening installation timelines for school-area traffic devices.▸Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
Aug 14 - Int. 1353 orders the department to finish traffic calming or control devices on streets next to schools within 60 days of a study determination. The law takes effect immediately. Sponsors moved to speed protective infrastructure for children.
Bill Int. 1353-2025 is at SPONSORSHIP and referred to the Committee on Transportation and Infrastructure. Introduced 07/14/2025 and recorded 08/14/2025, the matter is titled "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." The bill requires the department to complete installation within 60 days of a traffic study determination. Primary sponsor Farah N. Louis introduced it. Co-sponsors Jennifer Gutiérrez, Justin L. Brannan, Tiffany Cabán, Lincoln Restler and Shahana K. Hanif signed on. Requiring installation of traffic calming or control devices near schools within 60 days after a study determination is likely to improve safety for pedestrians and cyclists by accelerating protective infrastructure, encouraging safer driving, and supporting ‘safety in numbers’ and equitable protection for children; however impact depends on timely, evidence-based device selection and adequate resourcing for implementation.
- File Int 1353-2025, NYC Council – Legistar, Published 2025-08-14
14Int 1353-2025
Cabán co-sponsors faster installation of school traffic safety devices, boosting overall safety.▸Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
-
File Int 1353-2025,
NYC Council – Legistar,
Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
Aug 14 - Int 1353-2025 forces DOT to install traffic calming on streets beside schools within 60 days of a study finding. It shortens long delays that leave crossings and bike lanes exposed. Major transportation projects are exempt.
Int. No. 1353-2025 (status: Sponsorship; referred to Committee on Transportation and Infrastructure) was filed Aug. 14, 2025 and sent to committee the same day. The matter is titled: "A Local Law to amend the administrative code of the city of New York, in relation to the time permitted for the installation of a traffic calming device or traffic control device on any street adjacent to a school." It was introduced by Council Member Jennifer Gutiérrez and cosponsored by Tiffany Cabán, Lincoln Restler and Farah N. Louis. The bill would require that "the department shall complete the installation... by no later than 60 days after the department issues such traffic study determination." The law takes effect immediately. The measure requires timely installation of proven devices within 60 days, reducing deployment delays and protecting pedestrians and cyclists—especially children—while reasonably exempting major projects.
- File Int 1353-2025, NYC Council – Legistar, Published 2025-08-14
13
Pedestrian Killed In JFK Hit-And-Run▸Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
-
Pedestrian Killed In JFK Hit-And-Run,
ABC7,
Published 2025-08-13
Aug 13 - A man crossed South Conduit Avenue. A driver struck him. The driver fled. The man died at the hospital. Police search for answers. The street holds the silence.
ABC7 reported on August 13, 2025, that a 52-year-old man was killed crossing South Conduit Avenue near JFK Airport at 2:27 a.m. The driver fled the scene, leaving the man fatally injured. Police said, "The operator of the vehicle fled the scene after hitting the man." No arrests have been made. The crash happened where there is no crosswalk, on a busy parkway service road. The case highlights the dangers of unmarked crossings and the ongoing risk to pedestrians from hit-and-run drivers.
- Pedestrian Killed In JFK Hit-And-Run, ABC7, Published 2025-08-13